Solar Panels Not Producing Promised Energy: Can You Dispute the Contract?

Solar panels not producing promised energy? How lease and PPA production guarantees work, what degradation is normal, how to measure a shortfall and whom to claim from.

You can dispute solar panels not producing promised energy when your contract promised a minimum amount of electricity and the system, measured the way the contract measures it, falls short. Production guarantees are common in leases and power purchase agreements (PPAs), while a solar loan usually carries none, so with a system you own the dispute usually runs through the equipment warranties, the installer’s workmanship, or a claim that the production estimate was misrepresented when you signed. Either way, start by measuring the shortfall against the contract’s own number and ruling out normal aging and fixable faults.

If the panels make their expected power and your bill is still high, see why your electric bill is still high after solar; if the problem is the savings you were promised, see what to do when a solar salesperson lied about savings.

What does a solar production guarantee promise?

A production guarantee, also called a performance guaranty or a minimum energy guarantee, is a contract term in which the solar company promises the system will produce at least a stated amount of electricity over a stated period, and says how it will compensate you if it doesn’t. The California Public Utilities Commission (CPUC) tells buyers to ask, “Does the solar provider offer a minimum energy guarantee (common with leases and power purchase agreements)?” and how they will be compensated if the system falls short. The FTC tells lease and PPA customers to check “whether the contract guarantees a minimum level of power, and how the company will pay if the system doesn’t produce the minimum amount of power.”

Treasury’s consumer advisory uses the term too, telling buyers to find out “If the contract includes a ‘performance guaranty’ and how the company will pay if the system doesn’t produce the minimum amount of power.” Treasury’s separate lease and PPA guides don’t use that phrase. They ask “How many kilowatt-hours per month would this system produce on average?” and what recourse you have with the company “to cease payment if it not repaired or replaced in a timely manner” (Treasury’s wording).

Read your own guarantee for the minimum in kilowatt-hours, the period it’s measured over, whether it steps down each year, what it excludes, and how a shortfall is paid and claimed. That minimum may sit below the production estimate printed elsewhere in the same contract, so note both.

How do a lease, a PPA and a loan treat low production?

LeasePPALoan or cash purchase
What you pay forA payment for the equipment, flat or rising each yearEach kilowatt-hour delivered, at the contract rateThe system itself
Who maintains itGenerally the leasing companyThe PPA companyYou, backed by warranties
Production promiseOften a minimum energy guaranteeOften a minimum energy guaranteeUsually none in the loan
Where a shortfall hurtsSame payment, more power bought from the utilitySmaller PPA bill, more power bought from the utilitySame loan payment, more power bought from the utility

The CFPB describes a PPA as “paying for energy,” since the consumer pays “for the electricity they consume rather than a fixed cost for the panels.” Treasury says the leasing company “owns the system and is generally responsible for system maintenance,” and the CPUC says that with a lease or PPA the “Solar provider is responsible for all monitoring, maintenance, and repairs.” With a purchased system, the CPUC says, “You are typically responsible for repairs and maintenance.” For loans, the CFPB’s 2024 report observes that “Some solar loan agreements note that the consumer’s financial obligation does not depend on the system’s performance.”

How much should solar output drop each year?

Degradation is the slow, permanent loss of a solar panel’s output as it ages. NREL’s review of nearly 2,000 measured rates found “a median value of 0.5%/year,” with a mean of 0.8 percent and 78 percent of reported rates below 1 percent a year. At 0.5 percent a year, a panel makes roughly 95 percent of its first-year output in year 10 and about 88 percent in year 25 (our arithmetic).

Most systems land close to their estimates. In NREL’s 2014 study of almost 50,000 systems installed from 2009 to 2012, “About 90% of the systems with no reported issues produced more than 90% of the predicted electricity.” A system running more than 10 percent below its estimate is doing worse than most problem-free systems in that study, which is reason to look for a fault or a flawed estimate. Panels also carry their own performance warranties, so check the output floor in yours.

What else makes solar panels produce less than promised?

  • Inverter failure. NREL’s 2018 maintenance guide calls inverter failure “one of the most frequent causes of PV system performance loss.” The CPUC says the inverter “may need to be replaced sooner than other equipment.” A sudden drop, rather than a slow slide, points toward equipment like this.
  • Shade, dust and snow. The FTC lists “environmental factors like snow, dust, or shade” among the things that set a system’s output, and the CFPB names “tree growth” among the factors that affect performance.
  • A system that’s off. Output of zero can mean the system never received permission to operate or has shut down; see solar panels never activated and solar panels not working.
  • An estimate that was too high from the start. The CFPB found that some installers “overestimate the amount of electricity that solar panels will produce.” A system that has run well below its estimate since the first month, with no fault found, points here.

How do you measure the shortfall against the contract’s estimate?

  1. Find the contract’s numbers: the estimated first-year production, any contractual minimum, the measurement period and any yearly step-down. A monthly figure the salesperson quoted counts as evidence too.
  2. Get the production record. Export the history from the monitoring app or portal, and ask the company in writing for its own records. Your utility bill can’t stand in for it: the CPUC says the bill summarizes “how much electricity your home bought from and sent to the electric grid,” which leaves out the solar power your home used directly.
  3. Match the contract’s period. One cloudy month proves little, since weather is on the CFPB’s list of performance factors.
  4. Adjust for degradation if the contract’s estimate doesn’t already step down.
  5. Log every outage with dates, error messages, service visits and photos.

A made-up example: the contract estimates 9,000 kWh in year one. At 0.5 percent a year of degradation, year three should bring about 8,910 kWh. If monitoring shows 7,400 kWh, the system is about 1,510 kWh, or roughly 17 percent, short, far beyond normal aging. Then compare the result with the contract’s minimum and with how the guarantee says a shortfall is paid.

Is low production a contract issue or a technical one?

What you seeLikely technical causeWhen it becomes a contract issue
Output dropped suddenlyAn inverter, breaker or communication faultThe company responsible for repairs doesn’t fix it in reasonable time, or refuses a warranty claim
Output a little lower each yearNormal degradationOutput falls below the contract’s minimum or the panel warranty’s floor
Output low since the first monthShade, design or an inflated estimateA lease or PPA guarantee is missed, or the estimate was misrepresented at the sale
Output at zeroA system that is off or never approvedPayments keep running on a system that was never switched on

A technical problem turns into a contract problem when the company with a duty to fix it doesn’t. Even then, cancelling the contract is never automatic: it depends on the contract type, the dates, your state’s law and the facts. On a lease or PPA, that duty usually sits in the maintenance terms and the guarantee; on an owned system, it sits in the written warranties. The federal Magnuson-Moss Warranty Act covers only written warranties on consumer products, and the FTC’s interpretation of the Act says “warranties on services are not covered,” so an installer’s labor-only workmanship warranty is a matter of contract and state law. Inverter warranties can leave labor out: Enphase’s microinverter warranty “does not include any cost of labor related to” uninstalling or reinstalling the product, and SolarEdge’s excludes labor “relating to repairs, uninstalling, and reinstalling.”

Who do you send a production claim to?

Send it in writing to the company that owes the duty; the installer, lender, servicer and warranty provider may be four different companies.

  • Lease or PPA: the company that bills you now, citing the guarantee clause. After a bankruptcy that may be a servicer. Connecticut’s attorney general says SunStrong Management manages loans, leases and PPAs from Sunnova and SunPower, and sent it a civil investigative demand in February 2026 after about 65 consumer complaints, including complaints that it was failing to uphold warranties. Those are complaints under investigation, not findings.
  • Owned system: the installer for workmanship, and the panel or inverter maker for equipment defects, following the warranty’s claim steps and deadlines.
  • Loan: the lender owes no production promise unless the contract says so. If the installer arranged the loan, look for the FTC Holder Rule notice, which makes any holder “SUBJECT TO ALL CLAIMS AND DEFENSES WHICH THE DEBTOR COULD ASSERT AGAINST THE SELLER,” with recovery that “SHALL NOT EXCEED AMOUNTS PAID BY THE DEBTOR HEREUNDER.”

Keep paying while the claim is open. Any right to withhold payment, which Treasury’s guides tell lease and PPA customers to ask about, lives in your contract, so read it with an attorney before you hold anything back; the stop-paying page explains what missed payments can trigger.

What should you do about solar panels not producing promised energy?

Go in this order, which matches the routes in our guide to getting out of a solar contract.

  1. Inside a cancellation window? A shortfall usually shows up after the window has closed, but windows vary by state and some run longer than three days. If you are inside one, cancel in writing by the required method and send the lender a copy the same day; check the state cancellation laws and the deadline tool.
  2. Identify your contract and every company. Confirm whether you have a cash purchase, loan, lease, PPA or PACE financing, and name the installer, lender, servicer and warranty provider.
  3. Ask in writing, and complain for free. Send a written claim with your production figures, the contract clause, the outage log and the remedy you want. For a system you bought, the FTC says: “If you have a problem with a system you bought, try to resolve it with the company first,” and, failing that, to report it to the FTC at ReportFraud.ftc.gov and to your state attorney general. If a loan is involved, the CFPB takes complaints, and its complaint page first asks “Have you tried reaching out to the company?” For a lease or PPA, which the CFPB doesn’t list as a product, Treasury, the CFPB and the FTC jointly encourage people who believe they faced unfair or deceptive practices to complain to the FTC or their state consumer protection office, and your state attorney general and contractor licensing board take complaints as well.

Disclosure: Candid Yak works with Titan Advocacy Group, a solar consumer advocacy firm, and may be paid when readers hire it.

  1. If they refuse, and your documents show a gap between the production you were promised and what the company delivers, get a free case review from an attorney-backed firm. Choose one that:

    • reviews your contract, production records and correspondence before it quotes anything, and tells you plainly if a free route such as a warranty claim or written request is still open;
    • names the attorney who will handle your file, licensed in your state, so you can check that attorney with the state bar;
    • states its fee, and what happens to the fee if the company or lender refuses, in writing before you pay;
    • never tells you to stop paying your loan, lease or PPA;
    • never guarantees a result and never claims a connection to your installer, lender or servicer.

    Don’t pay anyone for this before the company has answered your written claim.

  2. Other routes. A lease or PPA may allow a buyout, which the exit cost calculator can compare with staying, or a transfer to a buyer if you sell; get any figure in writing. With a loan, a payoff or refinance changes the payment but not the production; see solar loan payoff and refinance and compare debt consolidation loans.

Disclosure: Candid Yak works with Titan Advocacy Group, a solar consumer advocacy firm, and may be paid when readers hire it. This page’s author, Kira Fairbank, is a manager at Vacation Ownership Consultants, a timeshare exit firm.

This is general information, not legal advice. A production claim turns on the exact wording of your guarantee, warranty or loan and on your state’s law, so have an attorney licensed in your state read the contract and your production records before you send a notice, sign a release, or change any payment.

Sources

  1. Consumer Advisory: Solar Energy Scams are Against the Law - U.S. Department of the Treasury, August 2024
  2. Before You Sign a Solar Lease Agreement - U.S. Department of the Treasury, August 2024
  3. Before You Sign a Power Purchase Agreement - U.S. Department of the Treasury, August 2024
  4. Treasury, CFPB, and FTC Announce Steps to Protect Residential Solar Consumers (JY2522) - U.S. Department of the Treasury, August 7, 2024
  5. Solar Power for Your Home - Federal Trade Commission, Consumer Advice
  6. California Solar Consumer Protection Guide (web page) - California Public Utilities Commission, checked October 2026
  7. California Solar Consumer Protection Guide, Version 3 - California Public Utilities Commission, March 2022
  8. Solar Consumer Protection Guide Addendum - California Public Utilities Commission, September 2, 2025
  9. Solar Financing Market Issue Spotlight - Consumer Financial Protection Bureau, August 2024
  10. Submit a complaint - Consumer Financial Protection Bureau, checked October 2026
  11. Photovoltaic Degradation Rates: An Analytical Review, NREL/JA-5200-51664 - Jordan and Kurtz, National Renewable Energy Laboratory, June 2012
  12. NREL Study of Fielded PV Systems Demonstrates PV Reliability, NREL/FS-5J00-62501 - National Renewable Energy Laboratory, August 2014
  13. Best Practices for Operation and Maintenance of Photovoltaic and Energy Storage Systems, 3rd Edition, NREL/TP-7A40-73822 - National Renewable Energy Laboratory, December 2018
  14. 16 CFR 700.1, Products covered (Magnuson-Moss Warranty Act interpretations) - Legal Information Institute
  15. Businessperson's Guide to Federal Warranty Law - Federal Trade Commission
  16. Enphase Energy Limited Warranty, IQ Microinverters, effective September 1, 2025 - Enphase Energy
  17. SolarEdge Limited Product Warranty (January 2026 file, effective April 15, 2026) - SolarEdge Technologies
  18. 16 CFR Part 433, Preservation of Consumers' Claims and Defenses (Holder Rule) - eCFR
  19. Attorney General Tong Announces New Developments to Hold Solar Industry Accountable - Connecticut Attorney General, March 17, 2026
  20. I-Team: Solar bankruptcies force CT homeowners to do business with new company, AG investigating - WFSB, May 4, 2026

Frequently asked questions

Can I dispute my solar contract if the panels produce less than promised?

You can when the contract promised a minimum amount of electricity and the system, measured the way the contract measures it, falls short, which mostly applies to leases and PPAs with a production guarantee. With a loan or cash purchase, the dispute usually runs through the equipment warranties, the installer's workmanship, or a claim that the production estimate was misrepresented at the sale. Measure the shortfall against the contract's own figure, put the claim in writing to the company that owes the duty, and get a case review if it refuses and your documents show a gap.

How much should solar panel output decline each year?

A little: NREL's review of nearly 2,000 measured degradation rates found a median of 0.5 percent a year, with 78 percent of reported rates below 1 percent a year. At 0.5 percent a year, a panel makes roughly 95 percent of its first-year output in year 10. A shortfall far larger than that points to a fault, shading, or an estimate that was too high.

Does a solar loan include a production guarantee?

Usually not. The CFPB's 2024 report observes that some solar loan agreements state that the borrower's financial obligation does not depend on the system's performance. A lease or PPA is where minimum energy guarantees are common; an owned system usually relies on the panel and inverter warranties and the installer's workmanship warranty, unless the installation contract itself promised a minimum output, which the FTC tells shoppers to look for in bids.

Where do I find my solar system's production data?

Start with the monitoring app or online portal for your inverter or system, and export the production history. Ask the installer, leasing company or PPA provider in writing for its production records too. Your utility bill is not a substitute, because it records the power you bought from and sent to the grid, not the solar power your home used directly.

Can I stop paying my solar lease if the system underproduces?

Don't stop or cut payments before an attorney licensed in your state has read the contract. Some leases and PPAs say what recourse you have if the system isn't repaired in time, and Treasury tells lease and PPA customers to ask exactly that, but missing payments without a contractual right can bring late fees, default and collection action under the contract. Send a written claim under the production guarantee and keep paying while it is open.